Hurricane Ridge

USA

- %
Open ski area
-
Snow type
cm
Snow depth

Hurricane Ridge Just 5 hours ago

We will be open with 2 lifts tomorrow the Bunny tow serving our beginner terrain and the Intermediate tow with access to the backcountry and intermediate terrain. The tubing area will not be open and there is a possible opening of some terrain park features. New storm tonight with the chance of strong wind. Pay attention to the Parks Twitter feed or the road condition phone for possible late opening. 360 565 3131 https://twitter.com/HRWinterAccess

Hurricane Ridge Just 18 hours ago

12/9 8:30am With winter weather conditions from top to bottom and a winter weather advisory in effect the road will remain closed today.

Hurricane Ridge Just 18 hours ago

12/9 8am Winter weather advisory in effect. Crews are working on road but status uncertain. A decision on today's road status expected at 9.

Hurricane Ridge Yesterday at 16:43:59

The ski areas that work together help the snowsports world stay and play together. HR is grateful to have the support of the Mountain Rider's Alliance and our fellow ski areas in the Pacific Northwest Ski Areas Association for all their support.

Hurricane Ridge 08-12-2016 at 06:20:39

This is your second and last chance to see Monumental: Skiing in Our National Parks in WA state. Made possible by our fine friends at Powder Mag. ONP trailer. Sat night at the Red Lion. Limited seating so get there early. https://www.youtube.com/watch?v=kSK-PJkuQcs

Hurricane Ridge 07-12-2016 at 04:09:43

The countdown begins to this Saturday nights showing of Monumental. https://youtu.be/blR870Dcq3E

Hurricane Ridge 07-12-2016 at 03:10:34

Operations and event calendar slowly but surely coming online. Click it to check it at the link. http://hurricaneridge.com/calendar/

Hurricane Ridge 06-12-2016 at 06:45:49

Should be a Monumental evening of Skiing in our National Parks this Saturday night http://hurricaneridge.com/event/2nd-saturday-ridge-fun-drsiser-serise/?instance_id=75

Hurricane Ridge 04-12-2016 at 19:04:59

12/4 10am Road open. All vehicles must carry chains. Road is icy/snowy drive carefully. Uphill gate closes at 4; all vehicles down by 5pm.

Hurricane Ridge 04-12-2016 at 17:53:25

If you don't like bluebird, cold smoke powder days. Then you probably shouldn't come up today

Hurricane Ridge 04-12-2016 at 17:21:47

Good morning and welcome to winter 2016/17. It's 19 degrees and nearly a a foot of new blower powder is on the menu. Road opens at 10. Chains are required to be in your car but not on your tires. Road is snowy and icy from the 1500 foot level, drive safely and have a great Ridge day.

Hurricane Ridge 04-12-2016 at 16:57:44

12/4 8am Road open at 10. All vehicles must carry chains. Uphill gate closes at 4; all vehicles down by 5pm. Road snowy/icy drive carefully.

Hurricane Ridge 04-12-2016 at 03:23:48

We will be open tomorrow, Dec 4th to begin the 2016/17 season with the Bunny tow and Intermediate tow. No tubing or terrain park. See you on the hill!!!

Hurricane Ridge 03-12-2016 at 16:58:36

12/3 8am Road open at 9. All vehicles must carry chains. Uphill gate closes at 4; vehicles down by 5pm. Early closure possible (weather).

Hurricane Ridge 02-12-2016 at 22:04:37

12/2 1pm Ridge Road is now closed for the day.

Hurricane Ridge 02-12-2016 at 17:56:23

12/2 8:55am Road open at 9am. Early closure today(weather); uphill closes no later than 1pm - all vehicles down past entrance by 2pm.

Hurricane Ridge 02-12-2016 at 17:02:11

12/2 8am Decision on today's road status at 9am. Crews plowing but currently facing high winds and low visibility.

Hurricane Ridge 30-11-2016 at 06:28:46

"Ridge Moms" When she's not traveling the world in search of fresh adventures you will find Barrett and her family hot lapping Ridge pow or surfing the area beaches. 20 year Legend status https://vimeo.com/193472455

Hurricane Ridge 27-11-2016 at 18:54:04

11/27 Road opened at 9am. Early closure- uphill gate closing no later than 1pm, all vehicles down past gate no later than 2pm. 7" new snow!

Hurricane Ridge 27-11-2016 at 16:56:38

11/27 8am. Road will open by 9am. Early closure today due to incoming weather. Uphill gate closes @ 1pm, all cars down past gate before 2pm.

Hurricane Ridge 26-11-2016 at 20:05:18

11/26 11am. Road open! All vehicles must carry tire chains & need to be down past gate by 5pm. Uphill gate closes at 4pm. Drive carefully!

Hurricane Ridge 26-11-2016 at 18:59:11

11/26 10am: Road expected to open at noon. All vehicles must carry chains & need to be down past gate by 5pm; uphill gate closes at 4.

Hurricane Ridge 26-11-2016 at 17:55:24

11/26/2016 8:55am: Crews continue plowing for a possible noon opening. A final decision in today's road status will be made at 10:00 am.

Hurricane Ridge 26-11-2016 at 16:53:02

11/26/2016 7:55am: Crews currently plowing 8-10" new snow. Today's road status uncertain at this time. Update at 9:00am.

Hurricane Ridge 25-11-2016 at 19:02:26

11/25/2016 10am: Ridge Road will remain closed today. Note: Crews will continue to work removing 8-10 foot snow drifts from parking area.